Fire protection | 15 godina iskustva| Anparo
15. February 2021.

We move to other spaces – what I need from occupational safety law / fire protection law

We are moving to other premises - what I need from the law on safety at work / fire protection law (hereinafter referred to as ZNR/ZOP) is a question that we are very happy to answer. Primarily because it is a frequent reason for moving the needs for a larger and better quality space, which means that the business entity is developing and growing. Is everything from ZNR/ZOP worth it to you if you change space? No. Do you have to do everything again? No. The truth is somewhere in between because part of the ZNR/ZOP obligations is related to employees, and part to the premises. By changing the space, you should think about those ZNR/ZOP items that concern the business premises itself, and this would be as follows:
8. February 2021.

We are opening our first warehouse – what do we need from occupational safety and fire protection?

We are opening our first warehouse, what do we need from occupational safety and fire protection? When opening a warehouse, it is important to know whether you are entering an already existing warehouse or if the warehouse is newly built just for your business / commodity assortment? Clients don't ask this question often enough. In practice, we from the industry often get information about this moment when the client has already entered the warehouse, and perhaps due to the condition and incompatibility of the warehouse with his needs, he should not have entered it. from entering the already existing warehouse, it is important to initially determine whether the project corresponds to your business, i.e. the assortment of goods that you intend to store inside, especially from the aspect of fire protection, because any modifications / reconstructions that you will have to undertake to comply with this area may not be financially profitable. Believe me, it's not the same if you store steel pipes, brick or rubber, paints and varnishes.
9. November 2020.

What do I need from the law on occupational safety when hiring the first employee?

I'm hiring my first employee - what do I need from occupational safety law/fire safety law? It is a question that many future employers ask with some reservation and fear since most of them have the impression that this is a Pandora's box whose contents are unknown, complicated, unfeasible and too expensive.
1. April 2020.
These Regulations prescribe minimum requirements regarding fire protection for catering facilities. Catering facilities are considered to be catering units that are as such determined by the regulation on classification, minimum requirements and categorization of catering facilities.
1. April 2020.
This Technical Regulation (hereinafter referred to as the Regulation) prescribes, in the context of meeting the essential requirements for construction works (hereinafter referred to as electrical installations), requirements for design, execution, usability, maintenance and other requirements for electrical installations, and the technical characteristics and other requirements for products intended for installation in electrical installations (hereinafter: for electrical installations).
30. March 2020.
This Ordinance prescribes the conditions for granting authorization to perform checks of the correctness and functionality (hereinafter: correctness) of the performed stable systems, devices and installations for fire detection, alarm and extinguishing, detection and notification of the presence of flammable gases and vapors and prevention of fire spread (hereinafter: systems), as well as the method of verifying their correctness.
30. March 2020.
This Ordinance prescribes the program and manner of training the population for the implementation of preventive fire protection measures, for firefighting and rescue of people and property endangered by fire, for the purpose of effective protection of the population and property endangered by fire.
30. March 2020.
This Ordinance prescribes the content of the fire protection study for buildings (hereinafter: the study) which serves as a basis for the development of all types of projects of the main design according to a special regulation.
30. March 2020.
This Ordinance determines the content and manner of drafting and applying methods in the preparation of fire risk assessment and technological explosion (hereinafter referred to as endangerment assessment) for buildings, construction parts and open spaces owned or used by a legal entity and for the area of municipality, city, district, City of Zagreb and žirpanija.
Ordinance on the development of fire and technological explosion risk assessment
This website uses cookies to enhance your experience. By using this website, you accept our terms of use.
Izjava o privatnosti